Walberton

In support of relocating a successful bespoke kitchen business to a new workshop facility, MJ Engineering Group carried out a detailed drainage design controlling the discharge rate with storage provided within a drainage basin.   Surface Water conveyed through...

March, Cambridgeshire

Planning permission secured for the development of 150no. residential dwellings.  MJ Engineering Group provided detailed Flood Risk Assessment and Drainage Strategy.  The strategy was based on using SuDS features to treat, convey and store surface water on the site....

Hemingford Abotts, Cambridgeshire

Successfully secure planning under Class R application to change an existing barn for 35-bedroom hotel use.  MJ Engineering Group provided a Flood Risk Assessment and Highway Assessment. 

Authority Disputes, Norfolk

Our client required assistance in revising a planning condition to unlock the purchase of 1no. plot in order the secure the funds to deliver the off-site highway improvement works.  We provide the necessary documentation and statements to support the revised condition...

Diss, Norfolk

MJ Engineering Group was commissioned to carry out a Flood Risk Assessment and Drainage Strategy for an Electric Car Charging station with associated food and drink facilities.  The site being located within flood zone 2 & 3 required ground modelling to determine...

Attend Future Build. London

MJ Engineering Group attend Future Build at the Excel Centre, taking in the latest products on SuDS designs such as green roofs, control devices and surface water treatment products.

Garrett Green, Birmingham

Commissioned by Space Station to provide a review of the existing drainage system to confirm the flood risk to the existing warehouse for converting to a self-storage unit. A new vehicular access was designed and approved.

Middleton, Suffolk, Drainage and external levels

We were commissioned to provide a drainage and external works design for a new residential dwelling, where retaining surface water on-site and enhancing the environment was a priority.  The surface water utilised permeable paving for surface water treatment before...

Wilby, Suffolk

Approval secured for culverting an existing ditch for a new access to serve the existing site. Approval included consent to pipe the ditch and construct the new access.

Primary School, Hereford, Flooding Review 

Following flooding issues being experienced at a Primary School, MJ Engineering was commissioned to carry out an assessment of the current drainage system and identify an issue, with mitigation measures.  The modelling established with the extension to the school over...